SITE:
CHINA LAKE NAVAL AIR STATION (SITE
LAYOUT CLICK HERE)
LOCATION: CHINA LAKE, CA
BUILDING APPLICATION: POOL
BUILDING
CHP LOOPS WORK PLAN

Site
Description
China Lake, CA was a chosen
site for one Plug Power GenSysTM 5CS- 5kW PEM fuel cell.
The unit is located at the bases swimming pool area
at China Lake Naval Air Station. It provided supplemental
heat to heating the swimming pool as well as clean electrical
generation to the nearby loads.
This fuel cell reforms natural gas into
a hydrogen fuel source, CO2 and water vapor. The GenSys
5kW fuel cell offers uninterruptible power to a critical
load in the event of grid disturbance. They are connected
to the electric utility grid and set to allow 2.5kW
output from the fuel cell.
These fuel cell installations also capitalize on a combined
heat and power (CHP) utilizing the fuel cells waste
heat to be recovered to supplement an existing hot water
system. This site was chosen based on thermal energy
requirements at the facility and the ability of the
fuel cell units to provide combined heat and power in
this application.
Fuel
Cell Performance
| Cummulative
Operating Hrs |
6536.8
Hours |
Capacity
Factor |
49.79%
|
| Total
Electric Output |
16311.2
kWh |
Availability
|
99.77%
|
| Total
Input Fuel |
207.7MMBTU |
Electrical
Efficiency |
26.80%
|
| |
|
|
|
Site
Layout
|