SITE PERFORMANCE SUMMARY
 
   
 
   
 
 




Site: North Island Naval Air Station Bldg 2003 (Laundromat)

Period Summary Statistics:

Unit 289 Unit 290 Unit 293

 
 
Total
Unit # 289
Unit #290
Unit #293
Start Date
 
--
8/17/2004
8/17/2004
8/17/2004
Thru Date
 
--
8/31/2005
8/31/2005
8/31/2005
Hours of Operation
Hours
25211.0
8695.4
7902.9
8612.7
kWh Output
kWh
62523.2
21776.3
19869.1
20877.7
Input Fuel
MMBTU
801.2
282.1
252.1
267.2
Electric Efficiency
%
26.67%
26.35%
26.95%
26.70%
Availability
%
93.37%
94.39%
90.87%
94.85%
Capacity Factor
%
46.33%
47.26%
45.68%
46.05%

Unit#1 (System Number#SU01B000000289)

Date
Oper. Hours
Total kWh
Avg. kW
Capacity Factor
Availability
Input Fuel (MMBTU)
Electric Eff.
08/04
230.0
814.3
2.49
34.04%
68%
7.53
25.91%
09/04
512.1
571.9
2.47
35.18%
71%
15.95
27.11%
10/04
744.0
1848.6
2.48
49.69%
98%
23.36
27.02%
11/04
720.0
1800.3
2.50
50.01%
100%
23.12
26.59%
12/04
744.0
1863.0
2.50
50.08%
100%
15.01
26.46%
01/05
744.0
1863.0
2.50
50.08%
100%
24.2
26.26%
02/05
619
1567.93
2.53
46.66%
92.11%
20.2
26.5%
03/05
732
1834.6
2.51
49.32%
98.39%
23.5
26.59%
04/05
702
1764.4
2.51
49.01%
97.5%
22.08
26.38%
05/05
744
1875.7
2.52
50.42%
100%
24.5
26.11%
06/05
720
1803.39
2.50
50.09%
100%
23.5
26.21%
07/05
743.15
1860.8
2.50
50.02%
99.89%
24.5
25.88%
08/05
742
1859.2
2.51
49.98%
99.73%
25.2
25.14%
               

Unit#2 (System Number#SU01B000000290)

Date
Oper. Hours
Total kWh
Avg. kW
Capacity Factor
Availability
Input Fuel (MMBTU)
Electric Eff.
08/04
336.0
838.2
2.49
49.89%
100%
10.287994
25.91%
09/04
720.0
1807.4
2.51
50.21%
100%
22.608594
27.11%
10/04
744.0
1872.9
2.52
50.35%
100%
23.598924
27.02%
11/04
720.0
1807.2
2.51
50.20%
100%
22.93669232
26.59%
12/04
744.0
1862.0
2.50
50.05%
100%
23.802112
26.46%
01/05
744.0
1875.0
2.52
50.40%
100%
24.3
26.38%
02/05
258
1323.7
2.51
39.40%
78.57%
16.9
26.79%
03/05
312
784.8
2.52
50.31%
50%
10.0
26.76%
04/05
464
1176.4
2.53
32.68%
64.57%
14.9
26.92%
05/05
536
1354.2
2.52
36.40%
72.16%
17.1
27.09%
06/05
657
1663.4
2.53
46.21%
91.28%
21.0
26.98%
07/05
720
1809.2
2.51
48.64%
96.77%
23.0
26.87%
08/05
580
1457.4
2.51
39.18%
77.96%
18.5
26.87%
               

Unit#3(System Number#SU01B000000293)

Date
Oper. Hours
Total kWh
Avg. kW
Capacity Factor
Availability
Input Fuel (MMBTU)
Electric Eff.
08/04
336.0
838.5
2.50
49.91%
100%
10.19
28.10%
09/04
720.0
1815.0
2.52
50.42%
100%
22.35
27.72%
10/04
705.0
1374.1
1.95
36.94%
95%
21.93
21.39%
11/04
720.0
1820.7
2.53
50.57%
100%
22.27
27.91%
12/04
744.0
1685.6
2.27
45.31%
100%
21.07
27.32%
01/05
601.6
1510.1
2.51
40.59%
81%
18.9
27.27%
02/05
540
1308.7
2.42
38.95%
80.36%
16.7
26.74%
03/05
721
1728.4
2.4
46.46%
96.97%
22.3
26.46%
04/05
704
1748.8
2.48
48.58%
97.84%
21.6
27.57%
05/05
720
1748.2
2.43
47.05%
96.77%
22.2
26.81%
06/05
706
1718.6
2.43
47.74%
98.16%
22.0
26.67%
07/05
743
1813.9
2.44
48.76%
99.94%
23.4
26.45%
08/05
650
1581.3
2.43
42.51%
87.37%
20.2
26.68%
               

Average kW = kWh ÷ Operating Hours
Availability = Operating Hours ÷ Hours in Period
Capacity Factor = Total kW Hours ÷ [Total Period Hours * Fuel Cell Rated kW]
Electrical Efficiency = [kWh x 3413 Btu/kWh] ÷ [Input Fuel MMBTU x 1 million Btu/MMBTU]

 